Details: site clerance including labour and matrials and including grass cutting/dressing and carrage of matrials by head load e/w in excavation in ordenery soil in foudation including labour and matrials and t/p with all com. work si no. 251 c.c. work in 1:6:12 in cement, fine sand and 40 mm gauge brick ballast including labour and matrials, t/p with all com. work si no. 273 r.c.c. work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials, t/p with all com. work si no.285 ms work in r.c.c. work including labour and matrials, t/p with all com. work sl no.504 construction of granular sub base (gsb) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.. p/l of 80 mm thick 1 shape plain interlocking cement concrete paver blocks, work si no. shifting of all material,add t
Sector: RDPR