Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. excavation for roadway in soil unsing manual means incluing loading in trucks for carrying of cut earth to embankment site with all lift and lead upto 1000 mtr. complete all as specied and directed. construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause 401. providing, laying, spreading and compacting stone aggregate
Sector: RDPR