Details: earth work in cutting / filling in ordinary soil with 3 no lead including ramming dressing and levelling for completion work as per sino- 253 excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain mimimum as per sino- 251 schedule rate concrete with 40 mm gauge ballast/stone ballast f/sand & cement in proportion of 12:6:1 in foundation and under floors including supply of all materials, labour and t & p etc. required for proper completion of the work as per sino- 773 first class brick work in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials labour and t & p etc required for proper completion of work as per morth anlysis 600 & 1200 supply of 80 mm thick zig jack shaped mechanically compressed interlocking cement concrete pavers block manufactrued by high pressure & controlled vibration machine having plan dimension 200x(160+120mm) with minimum 5 mm thick
Sector: RDPR