Details: supplying of earth for cutting or in embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and and also including 1.50m lift and 30 m lead . the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance and cartage upto 8km distance as directed by the engineer-in-charge providing and laying cement concrete in 1:6:12 (1 cement : 6 fine sand : 12 brick ballast 40 mm gauge) m-150 first class b/w in 1:4 cement c'sand mortor in sub structure including supply of all meterial labour t&p etc required for proper completion of work 12 mm thick plaster in 1:4 cement & coarse sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , labour t&p etc s.i.no. 584(i) providing and laying cement concrete with 1:2:4 (1cement 2 coarse sand