Details: earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m. in depth and and earth work in cartage upto 14 km.including remming and dressing the surface to required levels and slops and also including 1.50 m lift and 30 m lead . the earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30 m. as directed by engineer in charge excluding royality as per up.p.w.d.sor-2022 s.i.no-253(a). construction of granular sub base by providing well graded material spreading in uniform layers with tractor mount grader on prepared surface, mixing by mix in place method tractor with rotavator at omc, and compacting with three wheel 80-100 kn static roller to achieve the desire density, complete as per clause 401. as per mord analysis. m-150 brick work with 1:4 cement &coarse sand mortor in foundation and plingth including supply of all material, labour t&p etc . required for proper completion of wor
Sector: RDPR