Details: safe loading of 160 kva to 1000 kva repaired/new transformer at workshop jhansi/orai/lalitpur store jhansi/orai/lalitpur, safe carriage of transformer from workshop/store to site of work and safe unloading of same. intimate to je/lineman for taking shut down of damage transformer and disconnecting the h.t./l.t. connections & earthing of same by the lineman of concern distribution division. after disconnecting the damage transformer will be removed from double pole /plinth. installation of repaired/new transformer on double pole/plinth. after that h.t./l.t. connection & earthings will be made by line man of distribution division after that transformer will be energised. loading of old/damage transformer on the vehicle and safe carriage of the same from site to workshop/store including unloading and proper stacking. the contractor shall arrange vehicle, driver, labour and all required t&p (chain tackle,crain, rope etc.) at his level required for replacement of transformer at workshop jha
Sector: Distribution