Details: (a)excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in charge upto a distance of 30 m. from the foundation trenches. (where machine can not move ) disposal of malwa upto 8 km distance from worksite+all comp.of work concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. t&p etc. required for proper completion the work [sin no-273] m-150 brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including suopply of all material labour, t &p etc. required for proper completion of the work. sin no- 305(a) 12 mm thick plaster with cement and approved coarse sand