Details: earth work in excavation in trenches for foundations pipes cable etc in ordinary soil (loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the engineer i/c within a lead of 30 m. providing and laying in cement concrete 1:5:10 (1 cement : 5 fine sand : 10 graded brick aggregate 40 mm nominal size) and curing complete, including cost of form-work, in foundation class-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and t & p etc. required for proper completion of the work. providing and laying cement concrete 1:2:4 ( 1 cement : 2coarse sand : 4 graded stone ballast 20 mm. nominal size including supply of all materials. labour and t&p etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. providing & laying of 80mm thick ribber moulded zig