Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in- charge upto a distance of 30 m. from the foundation trenches. si no. 251 p.c.c.(1:4:8) cement coarse sand and stone ballast in foundation and under floorsincluding supply of all materials labour tools and plants etc. required for proper completion of the work. s.i no 281 m 150 (1:4) brick work ,coarse sand including supply of all materials labour t&p etc.required for proper completion of the work . s.i no 305 a supplying, fiting and placing hysd bar reinforcement in foundation complete as per drawing and technical specifications clause 1000 and 1202 r.c.c. work with cement, approved coarse sand & 2 cm (3/4") guage approved stone
Sector: RDPR