Details: excavation in foundation in ordinary soil(loam, clay or sand) including lift upto 1.50m. and lead upto 30 m. and including fillingwatering and ramming of excavated earthinto the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the engineer-in-charge upto a distance of 30 m. from the foundation trenches. (where machine can not reach/move). disposal of dismanteled material upto 2km concrete with 4 cm guage brick ballast, fine sand of 1.25f.m and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, tools & plant etc. required for proper completion of the work. si.no.273 r.c.c. work with cement approved coarsesand and 2 cm.(3/4") gauge approved stoneballast in the proportions of 1:2:4 in lintels fodoors and windows excluding supply ofreinforcement and its binding but including itsfixing and binding the same with 24 b.w.g.g.i.,
Sector: RDPR