Details: construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 providing and laying in position in c.c specified grade excluding the cost of centering, shuttering ,finishing and reinforcement ( 1:6:12)with cement , fine sand and 40mm gauge b/ ballast i/c all as per pwd spacifications no 273 brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600, 1202 & 1203 brick masonry in 1:4 cement mortar granular sub-base with well graded material (table400.1) by mix in place method-construction of granular sub-base by providing