Details: dismantling of old damage c.c. tiles road work i/c stacking of dismantlled materials as directed by e/i.within a distance of 60.00m excavation in foundation in ordinary soil (loam, clay or sand) including, lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30.0m from the foundation trencches.( s.i. no.251) (excluding royalty cement concrete with 4 cm (1.5'') gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials, labour and t&p etc. required for proper completion of the work cement concrete with 2 cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and t&p etc. required for proper comp
Sector: RDPR