Details: earth work in excavation in foundation in ordinary soil including 30m lead and 1.5 m lift with ramming dressing etc. all completed as per direction of e/i. as per dar no. 2.1.1 earth work in excavation in foundation in ordinary soil including 30m lead and 1.5 m lift with ramming dressing etc. all completed as per direction of e/i. as per dar no. 2.1.1 class-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and t&p etc. required for proper completion of the work. as per dar no. 6.1.1 construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in plase method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical apecification clause 401 supply/laying of 125 micron polythene laying c.c. road slab in position cement concrete of 1:2:4 (1 cement: 2 coarse sand, 4 graded
Sector: RDPR