Details: excavation in foundation in ordinary soil(loam, clay or sand) including lift upto1.50 m. and lead upto 30 m. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in- charge upto a distance of 30 m. from the foundation trenches. p.c.c.(1:6:12) cement fine sand and brick ballast in foundation and under floorsincluding supply of all materials labour tools and plants etc. required for proper completion of the work. s.i no 271 collection and consolidation of wbm top coat with 22.4 -53mm gauge stone ballast including supply of stone ballast of approved quarry, royalty.carriage uplo site loading unloading stacking, testing charges, trade tax and other taxes, octroi levies to and also including opening out stacks spreading stone ballast to required cambor and template and making mendies to retain water a
Sector: RDPR