Details: construction of granular sub-base by providing coarse graded material, spreading in uniform layears with motor graded on prepared surface, mixing by mix in place method with rotavator at omc,mord si. no.4.1 ch-20 p/ laying in cement concrete 1:5:10 (1 cement 5 fine sand 10 stone ballast 40 mm nominal size) and curing complete inclduing supply of all materials, labour and t&p etc required for proper completion of work as per direction of dsr. si. no. 4.1.10 ch 05 m-150 class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and t&p etc required for proper completion of work as per direction of e/i. s.i. no. 305 12 mm thick cement plaster in 1:4 cement and coarse sand mortar including all charges etc. as s.i. no. 584 construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base m-30 (grade) (1:1.5:3), with 43 grade cement @ 400 kg per , coarse and fine aggregate conforming to is 383
Sector: RDPR