Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m (5fts) and lead upto 30m (100fts) & including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charges upto a distance of 30m (100fts) from the foundation trenches. sch. pwd-251 p/l cement concrete (1:6:12) ratio cement fine sand & 40mm guage brick blast i/c labour materials t&p …….etc complete.sch.p.w.d.273 construction of granular sub-base by providing close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 first class brick work in (1:4) ratio cement & coarse sand mortar i/c labour materials t&p…..etc complete.sch.p.w.d. 305
Sector: RDPR