Details: dismantling reinforcement cement concrete or reinforcement brick work including stacking of materials as directed by eic. as per sor 694 excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m (5fts) and lead upto 30m (100fts) & including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charges upto a distance of 30m (100fts) from the foundation trenches. sch. pwd-251 p/l cement concrete (1:6:12) ratio cement fine sand & 40mm guage brick blast i/c labour materials t&p …….etc complete.sch.p.w.d.273 providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and broomi
Sector: RDPR