Details: construction of embankment with approved material obtained from availble land as permitted and approved by engineer-in-charge and as per technical specitaion clause 301.3.4.1, with all lifts and leads, spreading, grading to required and compacting to meet requirement of tables 300.1and 300.2 as per technical specification clause 301.5 excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. providing ,laying ,spreading and comp
Sector: PWD