Details: earth work in embankment in moorum mixed black cotton soil excavation to be in the form of regular pits not exceeding 0.5 mm depth and earth work in embankment to be in 20 cm layers including ramning & dressing the surface to required level and and also i/c 1.5m lift and 30m lead construction of gramlar sub-base by providing well graded material, sprading in unform layers with motor grader on prepared mixing by mix in place methoed with rotavator at omc and compacting with smooth sheel roller to achive the desired density complete as per tchnical specification clause 401 provaiding laying spreading and compacting stone aggregates of specification size to water bound macadam specification including spreading uniform thickness hand packing rolling with three wheel 80-100 kn static roller in stages to proper grade and camber applying and brooming crushable screming to fill-up the intersticcs of coares aggregate watering and campacting to the required density grading 3 as per tchnical sp
Sector: RDPR