Details: e/w in excavation in foundation in ordinary soil s.i.no.251 c.c. work in 1:6:12 cement,f/sand & 40 mm gauge brick ballast si no.273. m-150 brick work in 1:4 cement & f/sand. si no. 305. construction of granular sub-base grade 1 by providing well graded material, specification in uniform layers with motor grade on prepared surface, mixing by mix in place method with ratavator at omc, and compacting with smooth wheel roller to the desired density, complete as per technical specification clause 401. p/lof 125 micron thick polythene over bsae concrete i/c all cost complete laying cc road slab consisting of 1:1.5:3 cement c/sand & 20mm stone ballast over prepared sub grade i/c all complete of work si no. 773b making of construction joints with filler material. 12 mm thick plaster in 1:4 cement & f/sand mortar as per si no.584. s/f of signboard or lokarpan stone.
Sector: RDPR