Details: e/w excavation in foundation in ordinary soil as per si no 251 c.c. work in 1:6:12 cement, f-sand &40 mm gauge brick ballast i/c supply of all materials, labour t&p etc. required for proper completion of work si no 273 m-150 brick work in 1:4 cement & f-sand as per si no 253 construction of gramular sub base grade 1 by providing well graded material specification in uniform layers with motor grade on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to the desired density, completw as per technical specification clause 401. providing and laying of interlocking concrete block pavements having thickness 80mm including leveling & dressing of surface to required level & , spreading & moisting 30mm thick local sand on bed , filling joint with local sand etc . for proper completion of the work as per drawing and technical specification clause 1504 as per si no. 1500 ns 12mm thick plaster in 1:4 cement & f-sand mortar as per s
Sector: RDPR