Details: dismantling of old brick laid on edge kharanja/flat padanja including stacking of old bricks . si new item 3 ch-20 deduct old brick bats recived from dismantling soling i/c comp. all respect brick soling with straight over brunt bricks laid flat and dry (labour only) including preparation of subgrade to prescribed camber, filling joints with local earth spreading a blinding coat 1 cm (3/8") depth of local earth over the entire surface and including labour t&p etc.required for proper completion of the work.. si 785 earth work in cutting or in embankment in ordinary soil i/c extra cartage from distance 1.0km , excavation to be in the form of regular pits not exceeding 1/2 metre (20") in depth and earth work in embankment to be in 20 cm.(8") layers including ramming & dressing in ic all as per si-253(a) + including mechanically compected as per si no- 260a. concrete with 4 cm. gauge stone ballast, fine sand & cement, in proportion of 8:4:1 in foundation as s.i. n0-281 m-150 brick worki
Sector: RDPR