Details: earth work in embankment in ordinary soil, excavation to be done in form of regular pits not exceeding 1/2 m. in depth and work of embankment to be 20 cm layers including ramming & dressing the surfce to the required levels & slopes and including 1.5 m lift and 30 m. lead from the cutting to be used in making embankment or to be deposited as spoil banks with in 30 m. distance as directed by engineer-in-charge for proper completion of work. providing ,laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber ,applying and brooming ,stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density brick edging on both sides of the road with first class bricks 8 cm wide & 12 cm deep laid with mudmortar including labour & supply of bricks finished to required t
Sector: PWD