Details: construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per mord technical specification cause 301.5 mord sepecification 301.5(i) s.no. 3.4 construction of subgrade with stablization of soil with 2% slaked limeconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead up to 1000 m as per technical specification cause 303.1. including stablization with 2% staked lime including its mixing with rotabator complete. construction of granular sub base by providing well graded material, spreading in uniform layers with motar grader on prepared surface mixing by mix in place method with 2% cement (opc) with rotavator at omc, and compac
Sector: PWD