Details: cleaning jungles including uprooting of rank vegetation, grass, bushes wood trees and saplings of girth up to 30 cm measured at a height of 1 metre above ground level and removal of up to a distance of 50 m outside the periphery of area cleared. excavation in roundation in ordinary soil loom clean or sand in cooling lift up to 1.50 m and lead up to 30 m and including feeling watering and rhyming of activated earth into trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer incharge up to distance of 30 m from the foundation trenches. andtermite treatment of the bottom and sides of excavaction@5liter/sqm of surface area with chemical emulsion with chlarpyriphous/lindaue e.c. 20% with 1% concentration complete item. providing and leaving cement concrete in 1:5:10 (1 cement 5 course sand 10 graded stone aggregate 40 mm nominal size) and curing complete including cost of f
Sector: RDPR