Details: excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) construction of embankment with approved materials obtained from borrowpits with all lifts and leads, transporting to site , speading grading to required and compating to meet requirement of table 300-2. (including labour material t&p etc. complete as
Sector: PWD