Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in-charge upto a distance of 30m from the foundation trenches. si no-251 earth work in filling by cartage of earth including all charges for proper completion of work as per analysis . construction of granular sub base by providing will graded material spreadingin uniform layers with motograder on prepared surface mixing by mix in place method with smooth wheel roller to achieve the desired density complete as per technical specification clause 401.including all charges etc. providing and laying cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work
Sector: RDPR