Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. dsr 2023 2.32 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out anddisposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge.all kinds of soil (dsr2023, 2.6.1 supplying and filling in plinth with sand under floors, including watering, ramming, consolidatingand dressing complete.all kinds of soil (dsr2023, 2.27) diluting and injecting chemical emulsion for post-constructional anti-termite treatment (excluding the cost of chemical emulsion) treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter hole
Sector: RDPR