Details: earth work in excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 m form the foundation trenches. (rate including royalty of earth also) (4-chapter s.i.no.- 251) pwd shedule cartage of malva including up to 8km. distance loading & unloading etc. all complete. (none scheduled) providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in foundation and floors. (5-chapter pwd.si.-01) r.c.c work with cement approved coarse sand and 4cm gauge approved stone ballast in the proportion 1:2:4 (one part of cement, 2 part of coarse sand and 4 part of 4cm. stone grit) in r.cc raft foundation and footing 4cm. gu
Sector: RDPR