Details: construction of embankment with approved material obtainned from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300. 1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 providing, laying, spreading and compaction stone aggregates kof specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, folling with smooth wheel roller 80-100 kn in stage to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to llthe required density garding 3 as per technical specification clause 405. construction of un-reinforced, plain cement concrete pavement thickness as per design, over a prepared sub base, with 43 gradde cement or any other type as per clause 1501.2.2m-20 (grade), coarse an using curing compound (where specified) and water finishing to lines a
Sector: RDPR