Details: chlorine building & toner room, excavation for pipe line trenches in soil mix / all type of rocks with moorum/shingles/kanker requiring use of special t&p ie. pick axe, sabbals etc. lift upto 1.50 m lead upto 50 m. stacking and spreading as directed, normal dewatering,preparing the bed,filling watering ramming of excavated earth into pipe line trenches and disposal of surplus earth upto a distance of 10 km from the centre of the pipe line trenches excavation of structures: extra excavation due to change in drawing as per site condition the ffl has been changed due to current site condition old pcc bottom ,footing f1,f2,f3 and f4 as per direction of engineer incharge pouring concrete work pouring type: manual, concrete type: pcc, pouring subtype: all grade providing and laying plain cement concrete for all levels of all types e.g. foundations, fillings non-suspended floors, pavements and ramps, etc., including tamping, ramming, vibrating, curing, shuttering etc. in any shape position t
Sector: Water supply and Sewerage