Details: dismantling of bricks on edge soling including all. directed by the engineer- in-charge earth work in cutting or embankment in ordinary soil excavation to be in form of regular pits not exceeding 0.50 metre depth and earth work in embankment to be in 20cm (8") layers including ramming and dresing the surface to required level and but soil taken from 1 km cartage as per si. no 253 & cartage 1km brick on edge soling including all as per si. n0. 786 (labour rate only) excavation in foundation in ordinary soil (loam clay, or sand ) including lift upto 1.5 m & lift up to 30.0 mtr & including filling,watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundataion trenches or in to the plinth and removal & disposal of surplus earth as directed by the engineer- in-charge up to a distance of 30.0 mtr from the foundation trenches as per si. n0. 251. concrete with 4 cm. gauge
Sector: RDPR