Details: earth work filling in ordinary soil excavation to be in form of regular pits not exceeding 1/2 m. in depth and earth work in embankment to be 20 cm. layer including raming and dressing the surface to required level and and also including 1.5 m. lift and 30m. lead the earth work from cutting to be used in making embankment or to be deposited as spoil banks with in 30 m. distance. as directed by engineer in charge.chapt. 4 s.i n0.-1.2.25(a)(5 km carted earth) excavation of earth in foundation pipe, cable etc in ordinary soil (loam, clay or sand) including lift up to 1.5m. and lead upto 30.00 m. & dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by e/l with in lead 20 m. as per p.w.d. chapter 4 s.i no.2 (2.8) providing and laying cement concrete 1:6:12 (1cement : 6 coarse sand :12 graded brick aggregate 40 mm nominal size ) including supply of labour & t&p etc. require for proper completion of work. chapter 5 s.i.no.1(273) class m-150 brick wor
Sector: Urban Authority