Details: excavation in foundation in ordinary soil (loam, clay,sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into trench s or into into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in-charge upto a distance of 30m from the foundation trenches .mannual(small work) pwd sor ch.4 sl. no.1 earth work in filling with ordinary soil upto km-5 lead and carted, compacted including all charges with all complete dismantling interlocking tiles work in floors/roads laid in dry sand including stacking with 50m lead for thickness of tile 60mm to 80mm pwd sor ch.17 sl. no.22 diversion of drain water or dewatering & slush cleaning etc all complete as directed by eic. providing and laying cement concrete in 1:5:10(1 cement:5 fine sand :10 graded stone aaggregate 40 mm nominal size) and curing complete, including cost of form work. i
Sector: RDPR