Details: work dismetaling of old damage plaster including disposal all complete d.s.r. 15.56 racking out joints in lime or cement mortar and preparing the surface for re-pointing or replatering including disposal of to the dumping ground all complete as per direction of engineer in charge as per dsr 14.17 pg 230 vol 2 2023 plaster work in1:6 cement coarse sand d.s.r. 13.4.2 provinding &fixing double scaffolding system on exterior side d.s.r. 14.72. vol 2 page 233 renewing glass pan with putty and nails d.s.r.14.5.2 vol 2 page 229 hacking of cc flooring including clearing for surface etc complete as per direction of the engineer in charge as perdsr 14.83 pg 234 vol 2 2023 making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1;2;4 (cement/csand/stone chips) dsr 12.22 page no. 260(2021) providing and laying of c.c1:1.5:3 with cement :coarse sand: 20 mm stone grit dsr 4.1.1. page 103 vol 1 providing and laying of app(atacatic polypropylene polymer ) modified pre fab
Sector: RDPR