Details: excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m construction of embankment with approved material obtained from borrow pits with all lifts and leads,spreading,grading to required and compacted to meet requirement of table 300-2, mort&h specification-305. (for carted earth upto 2.0 km). construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the materi
Sector: PWD