Details: co-treatment facilities (stp (6.0 mld) fstp (16 kld) design, construction, supply of all materials, and commissioning of co treatment facilities (6.0 mld stp 16 kld fstp) with all the civil, electrical , mechanical, instrumentation and scada system, lt/ht panel, sub station building, dg set foundation, admin buidling, laboratories, meter room and campus development [construction of internal road (cc road, 3.5m wide, area approx 2000sqm.), staff quarters as per requirement and specification, external water supply (20kl tank including tube well and pumping arrangement, electrification & street llighting and sanitation work) etc. all complete for stp with co-treatment facilities. stp shall be based on sbr technology or any other proven technology. the effluent quality for agricultural uses (ph-6.5 to 8.3, ss-30 mg/l, oil&grease-10 mg/l, -10mg/l) , cod-30 mg/l , residual chlorine-nil , tkn-10mg/l, nitrate n-10 mg/l, f.c.-230 mpn/100 ml, dissolved p-5 mg/l (preferable 2 mg/l). ) sha
Sector: Water supply and Sewerage