Details: co-treatment facilities (stp (7.2 mld) fstp (7 kld) design, construction, supply of all materials, and commissioning of co treatment facilities (7.2 mld stp 7 kld fstp) with all the civil, lt/ht panel room, sub station building, dg set foundation, admin buidling, laboratories, meter room and campus development [construction of internal road (cc road, 3.6m wide, area approx 2000sqm),fiiling of earth if required] fully furnished administrative building having fully functional testing laboratory, plc/scada rooms, power generation building, blower building, sludge handling system & other building required for technology proposed. ocems system at inlet & outlet of stp and master control station (mcs) at stp. conference room suitable for 15 people, 4 rooms with a attached toilet for supervisory staff and a toilet block, drinking water cooler, all office rooms and conference room (air conditioned)., staff quarters as per requirement and specification, external water supply (20kl tank
Sector: Water supply and Sewerage