Description: CONSTRUCTION OF PUMP HOUSE AND TUBEWELL AT CENTRAL JAIL DISTT BAREILLY U P Name of Work CONSTRUCTION OF PUMP HOUSE AND TUBEWELL AT DISTT JAIL BAREILY UP
Details: Earth work in excavation in foundation soil (lime clay or sand) lead up to 30m and lift up to 1.5m and including filling,watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur plus earth as directed by the enginerr incharge up to a distance of 30 meters from the foundation trenches Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating anddressing complete. Providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stoneaggregate 40 mm nominal size). Diluting and injecting chemical emulsion for POST- CONSTRUCTIONAL anti- termite treatment (excludingthe cost of chemical emulsion)
Sector: Infrastructure