Details: dismantling interlocking tiles including stacking of dismantled materials as directed by engineer in charge as per si no 698 and transpoted lead 1 km excavation in foundation in ordinary soil (loam,clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or plinth from the foundation trenches as per s.i. no. 251 (a). cement concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proprtion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work including all type of taxes, octroi, tolls, cess but excluding cost of gst and as per direction of enc as per sor si no 281. m-150 class brick work in 1:4 cement & coarse sand 2.20 f.m. mortar in foundation and upto plinth level including supply of all materials, labour and t&p etc. requried for proper comp
Sector: RDPR