Details: dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the engineer-in- charge within a distance of 60 metre (200 feet). pwd sor 2022 17.3 excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the engineer-in- charge upto a distance of 30 m. from the foundation trenches. (where machine can notreach/move).pwd sor 2022 4.1.1 s/l p:c:c (1:6:12) with 40 mm gauge brick ballast,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ as per pwd sor 2022 page no 18 si no 5.01 item no 273 } r.c.c work with cement ,approved coarse sand & 2
Sector: RDPR