Details: e/w in excavation in foundation in ordinary soil etc all complete as the direction of engineer in charge.{ as per pwd sor 2022 page no 15 si no 4.01 item no 251 (a).} s/l p:c:c (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ as per pwd sor 2022 page no 18 si no 5.01 item no 273 } first class brick work in (1:4) cement & four coarse sand 2.20 f.m. morter in foundation and plinth and t&p etc all completed as per the direction of engineer - in - charge. (as per pwd sor 2022 page no 20 si no 6.05 item no 305 (a) 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (as per pwd sor 2022 page no 36 si no 13.11 new item ) r.c.c work wit
Sector: RDPR