Description: Toilet construction work near Naini Restaurant in A Block Ward 94 Name of Work Toilet construction work near Naini Restaurant in A Block Ward 94
Details: Clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. Earthwork in excavation by mechanical mens (Hydraulic excavator)/ manual means over areas(exceeding 30cm in depth, 1.5m width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by engineer-in-charge). Filling available excavated earth (excluding rock) in trenches, plinth, sidesof foundations etc, in layers not exceeding 20cm in depth, consolidatingeach deposited layer by ramming and watering, lead up to 50 and for alllift. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level: 1:4:8 derived from natural sources : 8 graded stone aggregate 40mm nominal size derived from natural sources) Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse a
Sector: RDPR