Details: dismantling reinforced cement concrete or reinforced brick work including stacking of materials taking out existing cc interlocking paver blocks from foothpath/central verge including removal earth work in embackment filling ordinary soil excavation to be in the form of regular pits not exceeding 0.50m in depth earth work in embankment concrete with 4cm gauge brick ballaste fine sand of 1.25 f.m. and cement in proportion of 1:6:12 in foundation m150 first class brick work in 1;4 cement & four coarsend mix mortar 12mm thick plaster with cement and coarsand of 1.25 fineness moudules in 1:4 supply and laying spreading and compacting 22.4 mm to 53 mm size stone aggregate of specification in uniform thickness hand picking rolling with 3 wheeled road construction of un rainforced plain cement concrete pavement including with laying and fixing of 125 micron thick polythene and construction joint cement concrete with 2cm gauge approved stone grit instead of 4cm gauge stone ballaste rising
Sector: RDPR