Details: demolishing reinforced cement concrete or reinforced brick work including stacking of materials as per directed by the of engineer-in -charge. taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge dsr 2023 16.83 deduct the cost of old tiles etc a.r s/l of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge.( as per pwd sor 2020 rmr) consolidation stone aggregates of 45-63mm/22.4-53mm size to water bound macadam,specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 kn static roller in stages to proper grade and camber applying and brooming crushable screening to fill-up the interstices of coarse aggregate,watering and compacti
Sector: RDPR