Details: excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. construction of embankment with approved material obtained form road side with all lifts and leads, transporting 3 km up to site, spreading, grading to required and compecting to meet requirement of table 300-2 and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compact
Sector: PWD