Details: constn. of embankment with approved materials obtained from borrow pits with all lifts and leas, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.1 & 300.2 with lead upto 1000m. as per technical specification clause 301.5 construction of granular sub-base by providing well graded ,spreading in uniform layers with motor grader on preapared surface, mixing by mix in place method with rotavater at omc ,and compacting with smooth wheel roller to achieve the desired dencity, complete as per technical specification clause 401. of mord data book providing, laying and spreading materials on a prepared sub grade, adding cement @ 2% by weight to the spread materials manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base. providing, laying and spreading materials on a prepared sub base, cement @ 4% by weight to the spread materi
Sector: PWD