Details: dismantelling of old rcc/rb ramp in lime or cement concrete mortar and including stacking of material as direction be the engineer in charge pwd sor 2022 iten no 17.3 s/l of 22.4 to 53 mm gauge stone ballast stacking for measurement etc all complete as per the direction of engineer charge (as per pwd sor 2020 rmr) consolidation of stone ballast in aggreated 45to 63 mm to 22. 4 to 53 mm aguge stone ballast size to water bound macadam specification including spreating in uniform thickness hand packing rolling with three wheels 80-100km static roller in satges to pr s/l of tack coat of bitumin@0.30kg/sqm including heating athe vg 10 bitumin sprayiing the bitumin with mechanically operated sprayed unit fitted on bitumin boiler & cleaning and prepairing the existing road surface etc all cpmplete as per the direction og engineer in charge (as per rmr) providing and laying dense graded bituminous macadum with hmp producing an average output of 75 tonnes per hour using crused aggregates fro
Sector: RDPR