Details: dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the engineer-in- charge within a distance of 60 metre (200 |feet). pwd sor 2022 17.3 earthwork filling in ordinary soil including extra cartage up to 8.00 km concrete with 4cm gauge brick ballast fine sand of 1.25 fm and cement in proportion of 1:6:12 in foundation and under floor including supply of all material labour tools & plant etc first class brick work in (1:4) cement & four coarse sand |2.20 f.m. morter in foundation and plinth and t&p etc all completed as per the direction of engineer - in -charge. (as per pwd sor 2022 page no 20 si no 6.0s item no 305 (a) 12 mm thick plaster with cement and coarse sand of1.25 |fineness modules in (1:4) over brick work minimunm thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (as per pwd sor 2022 page no 36 si no 13.11 new item) s/l c:c (1:2:
Sector: RDPR