Details: dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in- charge within a distance of 60 meter (200 feet).pwd sor 2022 17.2.2 dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the engineer-in- charge within a distance of 60 metre (200 feet). pwd sor 2022 17.3 taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in- charge.dsr 2023 16.83 excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth
Sector: RDPR